Magnetic Matter Movers

Work Item 22 — Citation & Uncertainty Pass: Kickoff (Headline Numbers)

Magnetic Matter Movers · compiled July 20, 2026

Scope of this kickoff: the cheat-sheet headline figures and the claims most likely to be challenged in review. Each row: study claim → best public source found → verdict and band. Remaining scope at the end. This does not close item 22; it establishes the method and clears the highest-visibility rows.


Verified rows

# Study claim Public source & figure Verdict
1 Chemical comparison: “$5–10k/kg chemical” and 2% payload fraction Falcon 9 list price raised to $74M in 2026; rideshare $7,000/kg; dedicated F9 ≈ $3.2–4.3k/kg LEO at 17–23 t; SpaceX internal cost reported ≈ $660/kg Revise band. “$5–10k/kg” is right for escape-class and rideshare, high for dedicated LEO. Recommended language: “LEO $3–7k/kg published prices; escape-class $5–10k/kg” → [E] with citation
2 Laser-thermal Isp 900 (solid HX ceiling) Kare’s HX thruster program (AIP Conf. Proc. 664, 442, 2003; OSTI 20632945): solid-HX laser launch at Isp 600–800 s; Duplay et al. 2022 (Acta Astronautica / arXiv 2201.00244) laser-plasma hydrogen: Isp ~3,000 s Consistent but at the edge. 900 s sits above published solid-HX demos, below plasma — matches the study’s own “solid-HX ceiling” framing and its Isp-850 de-rate check. Label [I]; cite Kare as floor, Duplay as the block-upgrade ceiling
3 “2,800× the largest EM launcher built” (gun extrapolation) Largest EM launchers: Navy/General Atomics railgun world-record ~33 MJ muzzle-energy class (ONR, 2010–2012 32 MJ prototypes) Confirmed order. 85 GJ / 32 MJ ≈ 2,650×; 48 GJ variant ≈ 1,500×. Recommended: “~1,500–2,700×” → [E] for the record, [I] for the extrapolation claim
4 Black carbon “≈500× surface warming potency”; “~1 t BC per launch” Ryan et al. 2022, Earth’s Future (10.1029/2021EF002612): BC at stratospheric injection ~500× more warming-efficient than surface/aviation BC — confirmed. Per-launch BC for kerolox: literature range ~0.3–3 t depending on engine/cycle 500× confirmed [E] with citation. Per-launch tonnage: widen to 0.3–3 t [I] pending engine-specific sourcing
5 “~25–30 t CO₂ per t payload, chemical” Order-of-magnitude check: F9 ≈ 490 t propellant burn ≈ ~500 t CO₂-class combustion products / ~17 t payload ≈ 29 t/t Consistent [I] — replace with sourced per-vehicle emissions inventory in full pass
6 Laser capex “$5–20/W” (dominant System B capex) Industrial fiber-laser market 2026: complete multi-kW cutting systems now ≈ $5–15/W all-in; bare high-power sources lower and falling; Duplay et al. use ~$10/W near-term with $1/W far-term projections Band confirmed [I], well-positioned on the curve; cite Duplay’s cost-curve discussion + market pricing snapshot
7 Myrabo lightcraft: “50 g to 71 m, 2000” (Phase 1 anchor) Lightcraft Technology Demonstrator, White Sands/HELSTF, Oct 2000: 10 kW pulsed CO₂ laser, ~50 g craft, 71–72 m altitude Confirmed [E]
8 HX flux “48 MW/m² = 3× fusion divertor” ITER divertor steady-state design target ~10 MW/m², transient/slow-transient 20 MW/m² Confirmed as 2.4–5× depending on reference point; keep “3×” with the 10–20 MW/m² citation → [E]
9 Tracking collapse “60.1% → 0.43%” (relay justification) Shimamura group 28 GHz program, J. Spacecraft & Rockets + Sci. Rep. 2025 (already cited in study) Already sourced [E] — carry citation into white paper reference list
10 Provisional filing “$65” USPTO current fee schedule: micro entity provisional = $65.00 (code 1005/2005/3005) Confirmed [E]
11 NM sky statistics (new, item 21) ABQ 167 clear/111 partly cloudy days, 76% possible sunshine Sourced [E] — see item 21 memo

Corrections to apply to the architecture study (forward-dated commit, per repo convention)

  1. Row 1: re-band the chemical $/kg comparison and add the 2026 price citations — the current “2%/$5–10k” framing is attackable as stale in review.
  2. Row 3: replace “2,800×” with “~1,500–2,700× (variant-dependent)”.
  3. Row 4: widen per-launch BC to 0.3–3 t; keep the 500× with the Ryan et al. DOI.
  4. General: rows 2, 5, 6 keep [I] labels but now carry citations — upgrade their footnotes from “memory-sourced” to “sourced, first-cut.”

Remaining item-22 scope (unchanged priority order)

Full $/kg inference chains (payload × capex × rate × amortization) with propagated uncertainty bands; capex curves ($0.1B/$4–12B/$23–84B) against published megaproject analogs; tug/depot trade table sources (electrolysis yield 0.78, steam Isp 400); aerocapture entry-speed heritage (MSL 5.8 km/s etc.); pulsed-power farm cost basis; Inductrack L/D and Halbach field claims to Post/Lawrence Livermore primary papers; line-by-line [E]/[I]/[S] sweep of the full study.


Sources: SatBase: F9 price 2026 · NextBigFuture: F9 internal cost · NASA NTRS: launch cost reduction · Kare HX thruster (ADS) · Kare HX development (OSTI) · Duplay et al. laser-thermal Mars (arXiv) · ONR railgun record · GA railgun record · Ryan et al. 2022, Earth’s Future · NOAA BC rocket climate report · USPTO fee schedule · Laser propulsion overview (Wikipedia, for chain-citations only) · 2026 fiber laser pricing guide